summaryrefslogtreecommitdiff
path: root/geiser/evaluation.scm
AgeCommit message (Collapse)Author
2010-10-11Guile: remote REPLs (connect-to-guile)Jose Antonio Ortega Ruiz
geiser-connect (or its specialisation, connect-to-guile) working for Guile, where the external process is started with the new --listen flag.
2010-09-07Guile: configurable warning levelJose Antonio Ortega Ruiz
2010-09-07Guile: evaluation warningsJose Antonio Ortega Ruiz
2010-06-07Guile: real fix for symbol locations (needs Guile's git head).Jose Antonio Ortega Ruiz
2010-06-06Guile: new evaluation strategy that really delimits stack frames.Jose Antonio Ortega Ruiz
2010-06-06Guile: fix for finding locations of symbols in modules outside load path.Jose Antonio Ortega Ruiz
2010-06-06Guile: fix for macroexpand.Jose Antonio Ortega Ruiz
2010-06-06Guile: better stack trace limits during evaluation.Jose Antonio Ortega Ruiz
2010-06-06Guile: evaluation fixes (current git head).Jose Antonio Ortega Ruiz
2010-04-16Guile: evaluation output collection reactivated.Jose Antonio Ortega Ruiz
with-output-to-string was broken in guile prior to 1.9.10.
2010-03-19Guile: better stack traces (using start-stack to delimit them).Jose Antonio Ortega Ruiz
2010-01-28Guile: support for the REPL debuggerJose Antonio Ortega Ruiz
On errors, we switch to the REPL, where the debugger is active.
2010-01-24Guile: Geiser now behaves correctly in buffers for unloaded modules.Jose Antonio Ortega Ruiz
2009-12-19Guile: adjustment to stack size display.Jose Antonio Ortega Ruiz
Getting rid of geiser-specific stack info -- guile seems to be providing no useful additional info in the current version.
2009-12-18Guile: fix for file loading (we always compile them now).Jose Antonio Ortega Ruiz
2009-09-23Guile: bug fix: evaluation works again (1.9.3 or better required).Jose Antonio Ortega Ruiz
2009-09-11BSD relicensing: Guile code.Jose Antonio Ortega Ruiz
2009-07-09Guile: unbreaking evaluation.Jose Antonio Ortega Ruiz
2009-07-02Simpler, nicer, more efficient handling of evaluation results. ItJose Antonio Ortega Ruiz
comes with a pony too.
2009-06-14Guile: Bug fix in the latest evaluation code changes.Jose Antonio Ortega Ruiz
2009-06-14Guile: better stack trace display.Jose Antonio Ortega Ruiz
2009-06-13Guile: rewriting stack trace captures - not yet complete.Jose Antonio Ortega Ruiz
2009-03-15Multiple values as evaluation result supported.Jose Antonio Ortega Ruiz
2009-03-02Breakdown of schemeland into neat submodules.Jose Antonio Ortega Ruiz